Skip to main content
PT. Dicon Jaya Asia

Operational since August 2019

Infrastructure, MEP, and Electronics for Private and Government Projects

Established in August 2019, PT. Dicon Jaya Asia plans, designs, and builds — delivering efficient, effective results for every stakeholder.

View Projects

Areas of Expertise

  1. Civil & Interior

    Commercial buildings, shophouses, houses, factories, and warehouses — from design and renovation to new construction, interior design, and furniture.

    • New construction & renovation
    • Interior design & furniture
    • Factories & warehouses
  2. Electrical

    Low- to medium-voltage panels and switchgear, through to solar power generation.

    • ATS & genset synchronising panels
    • Solar power generation
  3. Electronics

    Building security and automation systems, through to SCADA and control systems.

    • CCTV, access control & BAS
    • SCADA & control systems
  4. Mechanical

    Installation and maintenance of AC systems and gensets, through to diesel and gas engines for power generation — including service, repair, and machine shop work.

    • AC & precision AC (PAC)
    • Gensets & mechanical installation
    • Diesel & gas engines (PLTU/PLTG)
  5. Plumbing

    Clean, storm, and wastewater piping, hydrant and sprinkler systems, through to hospital medical gas installation.

    • Clean, storm & wastewater piping
    • Hydrant & sprinkler
    • Hospital medical gas
  6. Data Centre

    Full-lifecycle design, build, and maintenance of Container Data Centres (CDC) — one partner across the whole cycle.

    • Container Data Centre (CDC)
    • Design & installation
    • Ongoing maintenance

Projects we have delivered

Since 2019 — Government Agencies, Universities, and Private Companies

Filter by kind of work

Aston Kartika Grogol Hotel & Conference Center

  • Desain Interior Ballroom & Kamar Hotel

    Year 2021Kind of work InstallationDiscipline Civil & Interior

Bank Sumatera Selatan

  • UPS untuk ATM & Kantor

    Year 2019Kind of work InstallationDiscipline Electrical

JOB Tomori

  • Container Data Center

    Year 2022Kind of work InstallationDiscipline Data Centre

  • Cabling system

    Year 2020Kind of work InstallationDiscipline Electrical

K Academy

  • Desain Interior Akademi

    Year 2021Kind of work InstallationDiscipline Civil & Interior

Kantor PBNU Pusat

  • Interior Design, Panel Listrik

    Year 2019Kind of work InstallationDiscipline Civil & Interior

Kementerian Dalam Negeri

  • Aplikasi BUMDES

    Year 2022Kind of work OtherDiscipline Data Centre

Kota Casablanka

  • Testing and Commissioning Modul ComAp Synchron Genset dan PLN Genset 3 x 2000 kVA Genset Mitsubishi dengan 3 Inc PLN

    Year 2019Kind of work CommissioningDiscipline Electrical

Mandiri Tunas Finance

  • ME Gedung

    Year 2019Kind of work InstallationDiscipline Electrical

Menara FIF & Gedung Asuransi Astra

  • Perbaikan Hasil Thermograf Panel LVMDP, Trafo Panel Lantai

    Year 2021Kind of work MaintenanceDiscipline Electrical

Menara Rajawali

  • Upgrade Panel Synchron berikut pengadaan panel synchron RCPG (Remote Control Panel Genset) 4 x 1000 KVA

    Year 2021Kind of work SupplyDiscipline Electrical

Menara Tendean

  • Testing and Commissioning Synchron Genset dengan PLN 4 x 1800 KVA Genset Perkins dan 4 Panel LVMDP

    Year 2020Kind of work CommissioningDiscipline Electrical

Pasar Jaya

  • Renovasi Pasar Tebet Barat

    Year 2023Kind of work ConstructionDiscipline Civil & Interior

  • Renovasi Pasar Cipete Selatan

    Year 2023Kind of work ConstructionDiscipline Civil & Interior

Pemberdayaan Masyarakat Desa

  • Maintenance Data Center

    Year 2019Kind of work MaintenanceDiscipline Data Centre

PLTD Binongko Wakatobi

  • Instalasi genset 2 x 500 kVA, trafo 1000 kVA & modifikasi Panel Genset Cummins 2 x 500 KVA termasuk Test Com

    Year 2019Kind of work InstallationDiscipline Electrical

Polda Metro Jaya

  • Data Center

    Year 2020Kind of work InstallationDiscipline Data Centre

PT Bayu Maritim

  • Pengadaan Panel Synchron Genset dan Distribusi 2 x 1162 kVA Genset Caterpillar D399, Instalasi Kabel & Testing Commissioning

    Year 2021Kind of work SupplyDiscipline Electrical

PT. Cipta Sistem Integrasi

  • Cabling Sistem (Data & Power)

    Year 2019Kind of work InstallationDiscipline Electrical

PT. Coca Cola Indonesia

  • Pengadaan Genset Silent Cummins 500 KVA, Panel AMF, Kabel Power, Tangki Solar dan Instalasi Genset

    Year 2021Kind of work SupplyDiscipline Electrical

PT. CSI

  • Pembangunan Gedung dan Peralatan Data Center

    Year 2023Kind of work ConstructionDiscipline Data Centre

PT. Damai Indah Golf

  • Maintenance Service Genset 1x500 KVA

    Year 2022Kind of work MaintenanceDiscipline Mechanical

PT. Duta Tata Echoindo

  • Panel MCC – Fuel Pump

    Year 2022Kind of work InstallationDiscipline Electrical

PT Hengjaya Mineralindo

  • Testing and Commissioning Panel Synchron 2 x 500 KVA Genset Perkins silent

    Year 2020Kind of work CommissioningDiscipline Electrical

PT. Koninis Fajar Mineral

  • Pengadaan & Pekerjaan Instalasi Genset 2x250 KVA & 2x350 KVA, Kebutuhan Material Tools Team Elektrik CAM KFM

    Year 2021Kind of work InstallationDiscipline Electrical

PT KRN Apical

  • Testing and Commissioning Panel Synchron Genset dan PLN Medium Voltage

    Year 2021Kind of work CommissioningDiscipline Electrical

PT. Lima Menara Bintang

  • ME Gedung Diversity Site

    Year 2019Kind of work InstallationDiscipline Electrical

  • Genset & ATS

    Year 2019Kind of work InstallationDiscipline Electrical

PT. Petro One Indonesia

  • Container Data Center

    Year 2019Kind of work InstallationDiscipline Data Centre

  • ME Gedung Main HUB

    Year 2019Kind of work InstallationDiscipline Electrical

PT. PSN

  • Container Data Center (Banda Aceh dan Bengkulu)

    Year 2022Kind of work InstallationDiscipline Data Centre

PT. Rekind Daya Mamuju

  • Pengadaan Server dan Perangkat Pendukung

    Year 2023Kind of work SupplyDiscipline Data Centre

PT. Samadista Karya

  • Part Genset 1000 KVA Perkins, 650 KVA Perkins, 550 KVA Komatsu

    Year 2021Kind of work SupplyDiscipline Mechanical

PT. Schneider Elektrikal

  • Pembuatan Box Trafo 12000 KVA

    Year 2022Kind of work SupplyDiscipline Electrical

PT. Sejahtera Kelola Abadi

  • Micrologic 2.0 for n x 1000 MCB

    Year 2022Kind of work SupplyDiscipline Electrical

PT Telkomsel

  • Maintenance UPS 40 KVA

    Year 2022Kind of work MaintenanceDiscipline Electrical

Pusat Hidrografi dan Oseanografi TNI AL

  • Instalasi Command Center & Video Wall

    Year 2022Kind of work InstallationDiscipline Electrical

RSKO (Rumah Sakit Ketergantungan Obat)

  • Pekerjaan Pemeliharaan Genset 400 KVA & 500 KVA

    Year 2022Kind of work MaintenanceDiscipline Mechanical

SDN 05 Grogol & SDN 04 Kembangan

  • Pembangunan Gedung Sekolah SDN 05 Grogol & SDN 04 Kembangan

    Year 2022Kind of work ConstructionDiscipline Civil & Interior

Swiss-Belinn Cikande

  • Perbaikan Panel LVMDP, Perbaikan Panel PKG

    Year 2021Kind of work MaintenanceDiscipline Electrical

Swiss-Bell Hotel

  • Perbaikan Temuan Termograf

    Year 2021Kind of work MaintenanceDiscipline Electrical

Universitas Indonesia

  • Pembuatan Box panel Pompa 20 Pcs

    Year 2021Kind of work SupplyDiscipline Mechanical

Universitas Negeri Yogyakarta

  • Testing and Commissioning Panel ATS & AMF Genset Perkins 500 KVA dan 200 KVA

    Year 2019Kind of work CommissioningDiscipline Electrical

Vivo Mall Cimandala

  • Testing and Commissioning Synchron Genset dengan PLN 4 x 1800 KVA Genset Mitsubishi dan 5 Panel LVMDP

    Year 2020Kind of work CommissioningDiscipline Electrical

Fieldwork documentation

Our work archive — Every job will be documented thoroughly as evidence of the quality of our work.

    • A drainage trench dug along a precast concrete boundary wall, with block-work inspection pits built into it.
      Civil works
    • A worker in a hard hat and full coveralls drawing a hose across bare ground beside a line of concrete formwork.
      Civil works
    • Two workers pulling hoses across a cleared site, with tarpaulin site huts and a concrete boundary wall behind them.
      Civil works
    • A finished concrete walkway running along a boundary wall, with a hazard sign standing at the near end.
      Civil works
    • A three-storey reinforced concrete frame under construction, its top floor part filled with brickwork and cement sacks stacked at ground level.
      Civil works
    • A green cable tray hung from drop rods in a ceiling void, directly above a white bulkhead.
      Civil works
    • Chain slings and rope rigged around a large concrete slab on a rooftop, with painted steel beams laid out behind it.
      Civil works
    • An open low-voltage panel, its moulded-case circuit breakers wired to copper busbars in red, yellow and blue.
      Electrical panels
    • An open panel with a row of control relays above three breakers, and selector switches and indicator lamps mounted inside its door.
      Electrical panels
    • A control panel on an orange backplate, its terminal rails and contactors wired out to a controller mounted on the wall beside it.
      Electrical panels
    • Three floor-standing panels lined up behind a chain barrier, their meters and indicator lamps live, with engineers standing in front of them.
      Electrical panels
    • An engineer pressing the pushbuttons on a panel front while two colleagues watch from behind the chain barrier.
      Electrical panels
    • Six photographs in one grid: heavy cable terminations, a generator set beside its control panel, and crews working in plant rooms.
      Electrical panels
    • Copper earth bars inside a panel, with green-and-yellow earthing conductors, a circuit breaker and surge protection devices bonded to them.
      Earthing systems
    • A small enclosure holding three breakers wired down to brass earthing terminal strips.
      Earthing systems
    • A green steel tripod rig set up outdoors to sink an earth rod, with site containers behind it.
      Earthing systems
    • A digital earth tester lying on the ground reading 0.4 ohms, its test leads clipped to the electrode being measured.
      Earthing systems
    • Blue patch leads dressed down both sides of an open rack, feeding four patch panels stacked one above another.
      Data cabling
    • A full-height white cabinet seen from the front, packed with vertically dressed patch cords and switch ports showing green link lights.
      Data cabling
    • A rack-mounted server with a laptop resting on it, above two routers with orange and blue patch leads looping out of their ports.
      Data cabling
    • A router mounted above three switches in a wall cabinet, orange and blue leads crossing between their ports.
      Data cabling
    • A control room with a curved console of screens facing a video wall of dashboards, under a decorated ceiling frieze.
      Command centre
    • The same control room from the side, a logo filling the video wall and one person seated at a side desk.
      Command centre
    • A monitoring room where operators work at a wall of map displays while a colleague presents on a large touchscreen beside a conference table.
      Command centre
    • A small meeting room with an interactive display on the end wall, a flat screen on each side wall, and upholstered chairs around a dark table.
      Command centre
    • A three-dimensional visualisation of a containerised data centre, cut away to show the equipment racks inside and a row of air-conditioning units along one flank.
      Data centre
    • A three-dimensional visualisation of the same container seen from above with its roof removed, showing how the racks and the plant are laid out.
      Data centre
    • A three-dimensional visualisation of the closed container from outside, air-conditioning units mounted along its length on concrete footings.
      Data centre
    • A three-dimensional visualisation of the container's blank side, seated on concrete footings.
      Data centre
    • A dimensioned plan drawing of the containerised data centre, setting out the rack rows and the plant space at one end.
      Data centre
    • Front and rear elevation drawings of the container under its canopy, dimensioned in millimetres.
      Data centre
    • Four interior visualisations of the container: a white-walled aisle, the control panels at its end, red fire pipework overhead, and a row of racks.
      Data centre
    • The built container interior: overhead cable trays and pipework running the length of a white corridor towards a glazed door.
      Data centre
    • A narrow aisle inside the container with dark rack doors closed along one side.
      Data centre
    • Equipment cabinets standing along one side of the container aisle, with red fire pipework running above them.
      Data centre
    • A sprinkler pipe with a pendent head running below the container ceiling, past a wide equipment door.
      Data centre
    • Red fire pipework, an alarm sounder, and a control panel beside the container's double doors.
      Data centre
    • A control panel with indicator lamps at the head of the container aisle, cartons of equipment still on the floor.
      Data centre
    • A solar street light on its pole at the edge of a village road, with a technician standing at the foot of the pole.
      Solar power
    • An all-in-one solar street light newly stood on a village street lined with traditional timber houses, two men beside it.
      Solar power
    • Four people raising a solar street light pole on open ground towards dusk.
      Solar power
    • Dozens of LED street light fittings laid out on their cartons indoors, waiting to be installed.
      Solar power
    • Four all-in-one solar street lights of increasing size stood in a row against a wall.
      Solar power
    • A close view of a solar street light head mounted on its photovoltaic panel.
      Solar power
    • A technician in a hard hat and gloves connecting cabling at the back of a rooftop photovoltaic panel.
      Solar power
    • A photovoltaic array mounted on rails across a tiled roof, seen along the run of panels.
      Solar power
    • A technician in a high-visibility vest and hard hat checking a photovoltaic array on a house roof.
      Solar power
    • Two site banners reading Safety First and Utamakan Keselamatan dan Kesehatan Kerja, both carrying the company's own name.
      Health, safety and environment
    • Six workers in hard hats, masks and orange high-visibility vests lined up in front of the site safety banner.
      Health, safety and environment
    • A safety briefing under way: two workers in hard hats and vests facing each other in front of the safety banner.
      Health, safety and environment
    • The site crew gathered for a group photograph, holding a Safety First banner between them.
      Health, safety and environment
    • A larger crew holding the same banner inside an unfinished building, its walls still bare.
      Health, safety and environment
    • A satellite view of a coastal terminal with engineering linework laid over it, setting a new berth and trestle against the existing jetty.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A berthing layout drawing: tanker envelopes drawn over a service jetty, with its mooring and breasting dolphins dimensioned around it.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A long front elevation of a jetty, showing the piled trestle bents that carry its deck.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A densely annotated general arrangement of a jetty, its structure and pipe runs dimensioned throughout.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A satellite photograph of a long approach trestle running out to a berth, with a craned quay to one side.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A coloured wireframe perspective of a berth layout, with the main dimensions called out along its edges.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A CAD plan on a black ground setting berthing and mooring lines against the shoreline and the position of each dolphin.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A detailed berthing plan with a legend for the mooring dolphins, breasting dolphins, catwalks and the loading platform.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A cross-section through a jetty deck and its piles, marking the tide levels, the lightning protection mast and the mechanical and electrical room.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A front elevation of the full jetty run, its piled bents drawn at intervals along the deck.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A newly cast jetty deck with a roll of geotextile in the foreground, crews and a crawler crane working towards a tank farm on the shore.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • An engineer standing on the reinforcement mat of a deck before the pour, with a crane barge working behind him.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • Workers on a floating timber raft between finished pile caps, with a harbour of fishing boats behind them.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A concrete mixer and skip set up on a barge at sea, a crew filling the skip while ships lie at anchor beyond.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A crane lowering a concrete skip onto a pile cap, rows of completed caps standing out of the water around it.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A worker climbing onto a pile cap as a crane swings a concrete skip above the rows of piles.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A concrete skip hanging above a pile cap while three workers guide the pour from the cap below.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • A worker climbing onto a pile cap as a crane swings a concrete skip above the rows of piles.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • Workers in life vests riding a lifting line above a barge deck while a reinforcement cage is landed beside them.
      JettyAffiliate work — DJA's role here was subcontractor to the affiliate; DJA did not lead this work.
    • The blue glass office tower in South Jakarta that houses the company's head office.
      Office
    • Rows of blue solar panels tilted across a green field, stretching toward the horizon under a clear sky.
      Solar powerIllustration — not DJA's work
    • A data centre aisle lined with active server racks on both sides, indicator lights lit among neatly routed cabling.
      Data centreIllustration — not DJA's work
    • A blue industrial electrical distribution board with conduit piping and cable connections mounted neatly on a building's exterior wall.
      Electrical panelsIllustration — not DJA's work

Our character, our quality

Each character leads to a commitment — five principles we hold on every project, from day one through to handover.

Professional

Awareness of Social Responsibility

All team members are aware of their social responsibilities, adhere to applicable laws, and take actions that foster customer trust.

Accountability

Commitment to the Global Environment

We are dedicated to providing environmentally-friendly products, considering the global environmental impact, and striving to preserve the environment through the company's activities.

Integrity

Comprehensive Customer Orientation

We consistently engage with customers with humility and enthusiasm, delivering products and services that meet and exceed customer expectations.

Teamwork

Commitment to Technological Innovation

By closely monitoring global trends and developments, we aim to drive technological innovation, provide high-quality products tailored to customer needs, and position ourselves as leaders in the global industry.

Trusted

Corporate Culture Focused on Human Resources

We value and appreciate the potential and significance of each individual's work. We encourage innovation and a fearless approach to failure, fostering a corporate culture that maximises organisational excellence and individual contributions.

Frequently asked questions

Have a different question? Reach us directly by phone or email.

Does DJA only handle one type of work, or everything at once?

DJA handles every discipline under one roof — civil and interior, mechanical, electrical and electronics, plumbing, and data centres. You don't need a separate contractor for each part of your project.

Does DJA handle a project from design through to maintenance?

Yes. For each discipline, our team covers design, installation or construction, testing and commissioning, through to ongoing maintenance — with the same team from start to finish.

Does DJA have experience with both government and private clients?

Yes. Since 2019 we have completed 40+ projects for government clients — including Polda Metro Jaya and Pasar Jaya — and private clients, including PT. Coca Cola Indonesia and PT Telkomsel.

Does DJA handle data centre projects end to end?

Yes, including Container Data Centres (CDC) — design, build, and maintenance as a single package, not separate, disconnected jobs.

What if my project needs several disciplines at once — building construction, electrical panels, and AC, for example?

That's the advantage of working with DJA — the same team coordinates civil, mechanical, and electrical work together, so you aren't left to coordinate several contractors yourself.

How do I start a project consultation with DJA?

Contact us by phone or email — our team will discuss your project needs directly.

Ready to start your project?

WhatsApp is our preferred way to start the conversation. Call or email if you prefer.

Our Locations

Head Office

Aldeoz Building Lt.6

Jl. Warung Jati Barat No.39, Kalibata, Pancoran

Jakarta Selatan, DKI Jakarta

12740

Branch Office

Ampera Building

Jl. Ampera Raya No.18, RT.4/RW.4

Cilandak Timur, Ps. Minggu, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta

12560

Workshop

Jl. Raya Cisauk, Kelurahan Cisauk, Kecamatan Cisauk

Kabupaten Tangerang, Banten